40 CFR Part 63, Subpart FFFF

NESHAP Subpart FFFF (MON): Miscellaneous Organic Chemical Manufacturing

Subpart FFFF—National Emission Standards for Hazardous Air Pollutants: Miscellaneous Organic Chemical Manufacturing
Rule text from eCFRLast amended in eCFR 2024-04-04

Where this text comes from

Citation
40 CFR Part 63, Subpart FFFF
Official title
Subpart FFFF—National Emission Standards for Hazardous Air Pollutants: Miscellaneous Organic Chemical Manufacturing
Text as of
eCFR current through 2026-10-28, retrieved 2026-10-30
Latest amendment
2024-04-04
Source note
68 FR 63888, Nov. 10, 2003, unless otherwise noted.

Headings and quoted sections on this page are copied from the eCFR text of Subpart FFFF without changes. AirPermitHub checks eCFR every week and reviews any change before publishing it, so this page can trail eCFR by a few days. eCFR is maintained by the Office of the Federal Register and the Government Publishing Office. It is not an official legal edition of the CFR, and it does not show how an agency has applied the rule in a permit.

Where to look in Subpart FFFF

Sections sorted by the words in their eCFR headings. Read the full section before relying on it; requirements often sit in more than one place.

Compliance dates
§ 63.2445
Standards and limits
§ 63.2495§ 63.2500§ 63.2505
Tests, methods, and calculations
§ 63.2492
Notifications, reports, records
§ 63.2515§ 63.2520§ 63.2525
Definitions
§ 63.2550
Who implements it
§ 63.2545
General provisions
§ 63.2540

Who the subpart covers, in the rule's own words

The sections that set out what the subpart applies to, quoted in full from eCFR. Dates, sizes, and other figures are the rule's, not AirPermitHub's.

§ 63.2430 What is the purpose of this subpart?

Open in eCFR

This subpart establishes national emission standards for hazardous air pollutants (NESHAP) for miscellaneous organic chemical manufacturing. This subpart also establishes requirements to demonstrate initial and continuous compliance with the emission limits, operating limits, and work practice standards.

§ 63.2435 Am I subject to the requirements in this subpart?

Open in eCFR

(a) You are subject to the requirements in this subpart if you own or operate miscellaneous organic chemical manufacturing process units (MCPU) that are located at, or are part of, a major source of hazardous air pollutants (HAP) emissions as defined in section 112(a) of the Clean Air Act (CAA).

(b) An MCPU includes equipment necessary to operate a miscellaneous organic chemical manufacturing process, as defined in § 63.2550, that satisfies all of the conditions specified in paragraphs (b)(1) through (3) of this section. An MCPU also includes any assigned storage tanks and transfer racks; equipment in open systems that is used to convey or store water having the same concentration and flow characteristics as wastewater; and components such as pumps, compressors, agitators, pressure relief devices, sampling connection systems, open-ended valves or lines, valves, connectors, and instrumentation systems that are used to manufacture any material or family of materials described in paragraphs (b)(1)(i) through (v) of this section.

(1) The MCPU produces material or family of materials that is described in paragraph (b)(1)(i), (ii), (iii), (iv), or (v) of this section.

(i) An organic chemical(s) classified using the 1987 version of SIC code 282, 283, 284, 285, 286, 287, 289, or 386, except as provided in paragraph (c)(5) of this section.

(ii) An organic chemical(s) classified using the 1997 version of NAICS code 325, except as provided in paragraph (c)(5) of this section.

(iii) Quaternary ammonium compounds and ammonium sulfate produced with caprolactam.

(iv) Hydrazine.

(v) Organic solvents classified in any of the SIC or NAICS codes listed in paragraph (b)(1)(i) or (ii) of this section that are recovered using nondedicated solvent recovery operations.

Show the rest of § 63.2435 (12 more paragraphs)

(2) The MCPU processes, uses, or generates any of the organic HAP listed in section 112(b) of the CAA or hydrogen halide and halogen HAP, as defined in § 63.2550.

(3) The MCPU is not an affected source or part of an affected source under another subpart of this part 63, except for process vents from batch operations within a chemical manufacturing process unit (CMPU), as identified in § 63.100(j)(4). For this situation, the MCPU is the same as the CMPU as defined in § 63.100, and you are subject only to the requirements for batch process vents in this subpart.

(c) The requirements in this subpart do not apply to the operations specified in paragraphs (c)(1) through (7) of this section.

(1) Research and development facilities, as defined in section 112(c)(7) of the CAA.

(2) The manufacture of ammonium sulfate as a by-product, if the slurry entering the by-product manufacturing process contains 50 parts per million by weight (ppmw) HAP or less or 10 ppmw benzene or less. You must retain information, data, and analysis to document the HAP concentration in the entering slurry in order to claim this exemption.

(3) The affiliated operations located at an affected source under subparts GG (National Emission Standards for Aerospace Manufacturing and Rework Facilities), KK (National Emission Standards for the Printing and Publishing Industry), JJJJ (NESHAP: Paper and Other Web Coating), MMMM (NESHAP: Surface Coating of Miscellaneous Metal Parts and Products), and SSSS (NESHAP: Surface Coating of Metal Coil) of this part. Affiliated operations include, but are not limited to, mixing or dissolving of coating ingredients; coating mixing for viscosity adjustment, color tint or additive blending, or pH adjustment; cleaning of coating lines and coating line parts; handling and storage of coatings and solvent; and conveyance and treatment of wastewater.

(4) Fabricating operations (such as spinning or compressing a solid polymer into its end use); compounding operations (in which blending, melting, and resolidification of a solid polymer product occur for the purpose of incorporating additives, colorants, or stabilizers); and extrusion and drawing operations (converting an already produced solid polymer into a different shape by melting or mixing the polymer and then forcing it or pulling it through an orifice to create an extruded product). An operation is not exempt if it involves processing with HAP solvent or if an intended purpose of the operation is to remove residual HAP monomer.

(5) Production activities described using the 1997 version of NAICS codes 325131, 325181, 325188 (except the requirements do apply to hydrazine), 325314, 325991 (except the requirements do apply to reformulating plastics resins from recycled plastics products), and 325992 (except the requirements do apply to photographic chemicals).

(6) Tall oil recovery systems.

(7) Carbon monoxide production.

(d) If the predominant use of a transfer rack loading arm or storage tank (including storage tanks in series) is associated with a miscellaneous organic chemical manufacturing process, and the loading arm or storage tank is not part of an affected source under a subpart of this part 63, then you must assign the loading arm or storage tank to the MCPU for that miscellaneous organic chemical manufacturing process. If the predominant use cannot be determined, then you may assign the loading arm or storage tank to any MCPU that shares it and is subject to this subpart. If the use varies from year to year, then you must base the determination on the utilization that occurred during the year preceding November 10, 2003 or, if the loading arm or storage tank was not in operation during that year, you must base the use on the expected use for the first 5-year period after startup. You must include the determination in the notification of compliance status report specified in § 63.2520(d). You must redetermine the primary use at least once every 5 years, or any time you implement emissions averaging or pollution prevention after the compliance date.

(e) For nondedicated equipment used to create at least one MCPU, you may elect to develop process unit groups (PUG), determine the primary product of each PUG, and comply with the requirements of the subpart in 40 CFR part 63 that applies to that primary product as specified in § 63.2535(l).

[68 FR 63888, Nov. 10, 2003, as amended at 71 FR 40331, July 14, 2006; 85 FR 49132, Aug. 12, 2020]

§ 63.2440 What parts of my plant does this subpart cover?

Open in eCFR

(a) This subpart applies to each miscellaneous organic chemical manufacturing affected source.

(b) The miscellaneous organic chemical manufacturing affected source is the facilitywide collection of MCPU and heat exchange systems, wastewater, and waste management units that are associated with manufacturing materials described in § 63.2435(b)(1).

(c) A new affected source is described by either paragraph (c)(1) or (2) of this section.

(1) Each affected source defined in paragraph (b) of this section for which you commenced construction or reconstruction after April 4, 2002, and you meet the applicability criteria at the time you commenced construction or reconstruction.

(2) Each dedicated MCPU that has the potential to emit 10 tons per year (tpy) of any one HAP or 25 tpy of combined HAP, and you commenced construction or reconstruction of the MCPU after April 4, 2002. For the purposes of this paragraph, an MCPU is an affected source in the definition of the term “reconstruction” in § 63.2.

(d) An MCPU that is also a CMPU under § 63.100 is reconstructed for the purposes of this subpart if, and only if, the CMPU meets the requirements for reconstruction in § 63.100(l)(2).

Every section in Subpart FFFF

25 sections and 12 tables, in eCFR order. Each link opens the official text.

What This Subpart Covers

  • § 63.2430What is the purpose of this subpart?Amended 2016-09-12
  • § 63.2435Am I subject to the requirements in this subpart?Amended 2020-08-12
  • § 63.2440What parts of my plant does this subpart cover?Amended 2016-09-12

Compliance Dates

  • § 63.2445When do I have to comply with this subpart?Amended 2020-08-12

Emission Limits, Work Practice Standards, and Compliance Requirements

  • § 63.2450What are my general requirements for complying with this subpart?Amended 2024-04-04
  • § 63.2455What requirements must I meet for continuous process vents?Amended 2020-08-12
  • § 63.2460What requirements must I meet for batch process vents?Amended 2024-04-04
  • § 63.2465What requirements must I meet for process vents that emit hydrogen halide and halogen HAP or HAP metals?Amended 2020-08-12
  • § 63.2470What requirements must I meet for storage tanks?Amended 2024-04-04
  • § 63.2475What requirements must I meet for transfer racks?Amended 2020-08-12
  • § 63.2480What requirements must I meet for equipment leaks?Amended 2024-04-04
  • § 63.2485What requirements must I meet for wastewater streams and liquid streams in open systems within an MCPU?Amended 2020-08-12
  • § 63.2490What requirements must I meet for heat exchange systems?Amended 2024-04-04
  • § 63.2492How do I determine whether my process vent, storage tank, or equipment is in ethylene oxide service?Amended 2024-04-04
  • § 63.2493What requirements must I meet for process vents, storage tanks, or equipment that are in ethylene oxide service?Amended 2024-04-04

Alternative Means of Compliance

  • § 63.2495How do I comply with the pollution prevention standard?Amended 2020-08-12
  • § 63.2500How do I comply with emissions averaging?Amended 2020-08-12
  • § 63.2505How do I comply with the alternative standard?Amended 2020-08-12

Notification, Reports, and Records

  • § 63.2515What notifications must I submit and when?Amended 2024-04-04
  • § 63.2520What reports must I submit and when?Amended 2024-04-04
  • § 63.2525What records must I keep?Amended 2024-04-04

Other Requirements and Information

  • § 63.2535What compliance options do I have if part of my plant is subject to both this subpart and another subpart?Amended 2020-08-12
  • § 63.2540What parts of the General Provisions apply to me?Amended 2016-09-12
  • § 63.2545Who implements and enforces this subpart?Amended 2020-08-12
  • § 63.2550What definitions apply to this subpart?Amended 2024-04-04

Tables and appendices

Amendment history

Dates on which eCFR records a change to any section of Subpart FFFF, newest first.

  • 2024-04-04
  • 2023-03-08
  • 2021-01-19
  • 2020-11-19
  • 2020-10-13
  • 2020-08-12
  • 2016-09-12

To read the rulemakings behind these dates, search the Federal Register for Subpart FFFF. New EPA air rules and proposals also appear in the Federal Air Rule Tracker.

AirPermitHub provides educational, engineering, research, and compliance-support information. Information provided by the platform does not constitute legal advice and should not replace review of applicable regulations, permits, agency guidance, or consultation with qualified professionals. Full disclaimer