NM ยท EPA Region 6
New Mexico Air Permits
Major NSR (PSD & nonattainment)
Prevention of Significant Deterioration (PSD) Construction Permit
PSDMajor source construction permit for attainment areas.
Quoted verbatim from the agency source A stationary source is listed in Table 1 (20.2.74.501 NMAC) which emits, or has the potential to emit, 100 tons per year or more of any regulated new source review pollutant. Any stationary source not listed in Table 1 (20.2.74.501 NMAC): 250 tons per year or more of any regulated new source review pollutant.
20.2.74 NMAC; Table 1 at 20.2.74.501 NMACOfficial pageNonattainment Construction Permit
Nonattainment NSRRequired for qualifying sources in an area where at least one national or state ambient air quality standard is not being met.
20.2.79 NMACOfficial page
Title V operating permits
Title V Operating Permit
Title VOperating permit for major sources. Except for certain grandfathered sources, Title V sources must also obtain a construction permit before constructing or modifying. First-time applications are due within 12 months after the source begins operating as a Title V source.
Quoted verbatim from the agency source Facilities with the potential to emit more than 100 tons per year for any pollutant subject to regulation (includes VOCs), Landfills greater than 2.5 million cubic meters in volume, or Facilities with the potential to emit greater than 10 tons per year of a single Hazardous Air Pollutant, or 25 tons per year of any combination of Hazardous Air Pollutants.
20.2.70 NMACOfficial page
Oil & Gas
New Mexico has oil and gas specific NOI forms and general construction permits, plus the Oil and Gas Sector Ozone Precursor Pollutants rule (20.2.50 NMAC), which sets emission control requirements for oil and gas equipment in affected areas.
Oil and Gas Notice of Intent
Registration / NoticeNOI application form for oil and gas facilities.
20.2.73 NMACOfficial pageGCP-Oil and Gas
General PermitGeneral construction permit for oil and gas facilities.
20.2.72.220 NMACOfficial pageGCP-6: Oil and Gas Storage Vessels
General PermitGeneral construction permit for oil and gas storage vessels.
20.2.72.220 NMACOfficial pageGCP-TC: Temporary Control Facilities
General PermitGeneral construction permit for temporary control facilities (minor or major).
20.2.72.220 NMACOfficial pageOil and Gas Sector: Ozone Precursor Pollutants
OtherState rule establishing emission standards for VOC and NOx from oil and gas sector equipment.
20.2.50 NMACOfficial page
State air regulations
- 20.2.50 NMACOil and Gas Sector: Ozone Precursor Pollutants
- 20.2.70 NMACOperating Permits (Title V)
- 20.2.72 NMACConstruction Permits
- 20.2.73 NMACNotice of Intent and Emissions Inventory Requirements
- 20.2.74 NMACPermits: Prevention of Significant Deterioration
- 20.2.79 NMACPermits: Nonattainment Areas
- 20.11 NMACAlbuquerque-Bernalillo County air quality regulations
Forms
Guidance
Compliance
State compliance obligations (reporting, emissions inventory, testing) are being indexed. Use the Compliance dashboard preview to see how they will be tracked.
Sources
- NMED AQB Permitting home
- NMED Title V guidance
- NM State Records Center: 20.2.50 NMAC
- City of Albuquerque Air Quality Permits
Editorial note: Thresholds quoted verbatim from NMED's permitting home page; always confirm against the current NMAC text. Tribal lands are generally under EPA Region 6 jurisdiction, not NMED (not verified on NMED pages).
AirPermitHub provides educational, engineering, research, and compliance-support information. Information provided by the platform does not constitute legal advice and should not replace review of applicable regulations, permits, agency guidance, or consultation with qualified professionals. Full disclaimer