Skip to content
AirPermitHub

40 CFR Part 60, Subpart XXX

NSPS Subpart XXX: Municipal Solid Waste Landfills That Commenced Construction, Reconstruction, or Modification After July 17, 2014

Subpart XXX—Standards of Performance for Municipal Solid Waste Landfills That Commenced Construction, Reconstruction, or Modification After July 17, 2014
Rule text from eCFRLast amended in eCFR 2022-02-14

Where this text comes from

Citation
40 CFR Part 60, Subpart XXX
Official title
Subpart XXX—Standards of Performance for Municipal Solid Waste Landfills That Commenced Construction, Reconstruction, or Modification After July 17, 2014
Text as of
eCFR current through 2026-10-28, retrieved 2026-10-30
Latest amendment
2022-02-14
Source note
81 FR 59368, Aug. 29, 2016, unless otherwise noted.

Headings and quoted sections on this page are copied from the eCFR text of Subpart XXX without changes. AirPermitHub checks eCFR every week and reviews any change before publishing it, so this page can trail eCFR by a few days. eCFR is maintained by the Office of the Federal Register and the Government Publishing Office. It is not an official legal edition of the CFR, and it does not show how an agency has applied the rule in a permit.

Where to look in Subpart XXX

Sections sorted by the words in their eCFR headings. Read the full section before relying on it; requirements often sit in more than one place.

Who is covered
§ 60.760
Standards and limits
§ 60.762§ 60.763§ 60.765
Showing compliance
§ 60.765
Monitoring
§ 60.766
Tests, methods, and calculations
§ 60.764
Notifications, reports, records
§ 60.767§ 60.768
Definitions
§ 60.761
Who implements it
§ 60.760

Who the subpart covers, in the rule's own words

The sections that set out what the subpart applies to, quoted in full from eCFR. Dates, sizes, and other figures are the rule's, not AirPermitHub's.

§ 60.760 Applicability, designation of affected source, and delegation of authority.

Open in eCFR

(a) The provisions of this subpart apply to each municipal solid waste landfill that commenced construction, reconstruction, or modification after July 17, 2014. Physical or operational changes made to an MSW landfill solely to comply with subparts Cc, Cf, or WWW of this part are not considered construction, reconstruction, or modification for the purposes of this section.

(b) The following authorities are retained by the Administrator and are not transferred to the state: § 60.764(a)(5).

(c) Activities required by or conducted pursuant to a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), Resource Conservation and Recovery Act (RCRA), or state remedial action are not considered construction, reconstruction, or modification for purposes of this subpart.

Every section in Subpart XXX

10 sections, in eCFR order. Each link opens the official text.

  • § 60.760Applicability, designation of affected source, and delegation of authority.Amended 2016-12-23
  • § 60.761Definitions.Amended 2022-02-14
  • § 60.762Standards for air emissions from municipal solid waste landfills.Amended 2022-02-14
  • § 60.763Operational standards for collection and control systems.Amended 2016-12-23
  • § 60.764Test methods and procedures.Amended 2016-12-23
  • § 60.765Compliance provisions.Amended 2020-03-26
  • § 60.766Monitoring of operations.Amended 2020-12-07
  • § 60.767Reporting requirements.Amended 2022-02-14
  • § 60.768Recordkeeping requirements.Amended 2020-03-26
  • § 60.769Specifications for active collection systems.Amended 2016-12-23

Amendment history

Dates on which eCFR records a change to any section of Subpart XXX, newest first.

  • 2022-02-14
  • 2020-12-07
  • 2020-10-07
  • 2020-03-26
  • 2017-08-29
  • 2016-12-23

To read the rulemakings behind these dates, search the Federal Register for Subpart XXX. New EPA air rules and proposals also appear in the Federal Air Rule Tracker.

AirPermitHub provides educational, engineering, research, and compliance-support information. Information provided by the platform does not constitute legal advice and should not replace review of applicable regulations, permits, agency guidance, or consultation with qualified professionals. Full disclaimer