Where this text comes from
- Citation
- 40 CFR Part 60, Subpart TTTT
- Official title
- Subpart TTTT—Standards of Performance for Greenhouse Gas Emissions for Electric Generating Units
- Text as of
- eCFR current through 2026-10-28, retrieved 2026-10-30
- Latest amendment
- 2026-09-17
- Source note
- 80 FR 64648, Oct. 23, 2015, unless otherwise noted.
Headings and quoted sections on this page are copied from the eCFR text of Subpart TTTT without changes. AirPermitHub checks eCFR every week and reviews any change before publishing it, so this page can trail eCFR by a few days. eCFR is maintained by the Office of the Federal Register and the Government Publishing Office. It is not an official legal edition of the CFR, and it does not show how an agency has applied the rule in a permit.
Where to look in Subpart TTTT
Sections sorted by the words in their eCFR headings. Read the full section before relying on it; requirements often sit in more than one place.
Who the subpart covers, in the rule's own words
The sections that set out what the subpart applies to, quoted in full from eCFR. Dates, sizes, and other figures are the rule's, not AirPermitHub's.
§ 60.5508 What is the purpose of this subpart?
Open in eCFRThis subpart establishes emission standards and compliance schedules for the control of greenhouse gas (GHG) emissions from a steam generating unit or an integrated gasification combined cycle (IGCC) facility that commences construction after January 8, 2014, commences reconstruction after June 18, 2014, or commences modification after January 8, 2014, but on or before May 23, 2023. This subpart also establishes emission standards and compliance schedules for the control of GHG emissions from a stationary combustion turbine that commences construction after January 8, 2014, but on or before May 23, 2023, or commences reconstruction after June 18, 2014, but on or before May 23, 2023. An affected steam generating unit, IGCC, or stationary combustion turbine shall, for the purposes of this subpart, be referred to as an affected electric generating unit (EGU).
[89 FR 40028, May 9, 2024]
§ 60.5509 What are my general requirements for complying with this subpart?
Open in eCFR(a) Except as provided for in paragraph (b) of this section, the GHG standards included in this subpart apply to any steam generating unit or IGCC that commenced construction after January 8, 2014, or commenced modification or reconstruction after June 18, 2014, that meets the relevant applicability conditions in paragraphs (a)(1) and (2) of this section. The GHG standards included in this subpart also apply to any stationary combustion turbine that commenced construction after January 8, 2014, but on or before May 23, 2023, or commenced reconstruction after June 18, 2014, but on or before May 23, 2023, that meets the relevant applicability conditions in paragraphs (a)(1) and (2) of this section.
(1) Has a base load rating greater than 260 gigajoules per hour (GJ/h) (250 million British thermal units per hour (MMBtu/h)) of fossil fuel (either alone or in combination with any other fuel); and
(2) Serves a generator or generators capable of selling greater than 25 megawatts (MW) of electricity to a utility power distribution system.
(b) You are not subject to the requirements of this subpart if your affected EGU meets any of the conditions specified in paragraphs (b)(1) through (10) of this section.
(1) Your EGU is a steam generating unit or IGCC whose annual net-electric sales have never exceeded one-third of its potential electric output or 219,000 megawatt-hour (MWh), whichever is greater, and is currently subject to a federally enforceable permit condition limiting annual net-electric sales to no more than one-third of its potential electric output or 219,000 MWh, whichever is greater.
(2) Your EGU is capable of deriving 50 percent or more of the heat input from non-fossil fuel at the base load rating and is also subject to a federally enforceable permit condition limiting the annual capacity factor for all fossil fuels combined of 10 percent (0.10) or less.
(3) Your EGU is a combined heat and power unit that is subject to a federally enforceable permit condition limiting annual net-electric sales to no more than either 219,000 MWh or the product of the design efficiency and the potential electric output, whichever is greater.
(4) Your EGU serves a generator along with other steam generating unit(s), IGCC, or stationary combustion turbine(s) where the effective generation capacity (determined based on a prorated output of the base load rating of each steam generating unit, IGCC, or stationary combustion turbine) is 25 MW or less.
Show the rest of § 60.5509 (6 more paragraphs)Hide the rest of § 60.5509
(5) Your EGU is a municipal waste combustor that is subject to subpart Eb of this part.
(6) Your EGU is a commercial or industrial solid waste incineration unit that is subject to subpart CCCC of this part.
(7) Your EGU is a steam generating unit or IGCC that undergoes a modification resulting in an hourly increase in CO2 emissions (mass per hour) of 10 percent or less (2 significant figures). Modified units that are not subject to the requirements of this subpart pursuant to this paragraph (b)(7) continue to be existing units under section 111 with respect to CO2 emissions standards.
(8) Your EGU is a stationary combustion turbine that is not capable of combusting natural gas (e.g., not connected to a natural gas pipeline).
(9) Your EGU derives greater than 50 percent of the heat input from an industrial process that does not produce any electrical or mechanical output or useful thermal output that is used outside the affected EGU.
(10) Your EGU is subject to subpart TTTTa of this part.
[89 FR 40028, May 9, 2024]
Every section in Subpart TTTT
14 sections and 3 tables, in eCFR order. Each link opens the official text.
Applicability
Emission Standards
General Compliance Requirements
- § 60.5525What are my general requirements for complying with this subpart?Amended 2024-07-08
Monitoring and Compliance Determination Procedures
Notification, Reports, and Records
Other Requirements and Information
Tables and appendices
- TableTable 1 to Subpart TTTT of Part 60—CO2 Emission Standards for Affected Steam Generating Units and Integrated Gasification Combined Cycle Facilities That Commenced Construction After January 8, 2014, and Reconstruction or Modification After June 18, 2014See eCFR
- TableTable 2 to Subpart TTTT of Part 60—CO2 Emission Standards for Affected Stationary Combustion Turbines That Commenced Construction After January 8, 2014, and Reconstruction After June 18, 2014 (Net Energy Output-Based Standards Applicable as Approved by the Administrator)See eCFR
- TableTable 3 to Subpart TTTT of Part 60—Applicability of Subpart A of Part 60 (General Provisions) to Subpart TTTTSee eCFR
Amendment history
Dates on which eCFR records a change to any section of Subpart TTTT, newest first.
- 2026-09-17
- 2024-07-08
- 2024-05-09
- 2016-12-23
To read the rulemakings behind these dates, search the Federal Register for Subpart TTTT. New EPA air rules and proposals also appear in the Federal Air Rule Tracker.
AirPermitHub provides educational, engineering, research, and compliance-support information. Information provided by the platform does not constitute legal advice and should not replace review of applicable regulations, permits, agency guidance, or consultation with qualified professionals. Full disclaimer