OH ยท EPA Region 5
Ohio Air Permits
Major NSR (PSD & nonattainment)
Attainment provisions (PSD)
PSDReview of major stationary sources and major modifications in attainment or unclassifiable areas, including BACT and Class I/II increments.
OAC 3745-31-10 to 3745-31-20Official pageNonattainment provisions
Nonattainment NSRMajor stationary sources and major modifications in nonattainment areas may not begin actual construction until rules 3745-31-21 through 3745-31-27 are met and a PTI is obtained (LAER and offsets).
OAC 3745-31-21 to 3745-31-27Official page
Title V operating permits
Title V Operating Permit
Title VNew major sources file within 12 months of becoming subject to Title V; renewals are filed 6 to 18 months before expiration. Title V and Synthetic Minor Title V facilities must use the eBusiness Center Air Services. Fees are per ton of actual emissions plus a base fee (OAC 3745-78, ORC 3745.11).
Quoted verbatim from the agency source 100 tons per year or more of any one regulated pollutant ... 10 tons per year or more of any one hazardous air pollutant (HAP) ... 25 tons per year or more of any two or more HAPs
OAC Chapter 3745-77Official page
Oil & Gas
Ohio (Utica/Marcellus) uses general permits for upstream and midstream oil and gas. Well-site GPs 12.1 and 12.2 (2014) are no longer available for new sources as of May 7, 2024 (the effective date of NSPS OOOOb) but are renewed for non-OOOOb facilities; GPs 12.3.1 and 12.3.2 cover sources constructed, modified, or reconstructed after December 6, 2022 and incorporate OOOOb. Midstream compressor stations use a family of unit-specific GPs (engines, dehydrators, flares, compressors, leaks, tanks, truck loading, pigging), with supplemental information showing the project won't trigger major NSR.
Well-site production GP 12.1 / 12.2 (legacy)
General PermitGP 12.1 (small flare) and GP 12.2 (large flare) cover glycol dehydrators, gas and diesel engines, fixed roof tanks, flares, and ancillary equipment at well sites. Terms effective April 4, 2014; closed to new sources from May 7, 2024.
Thresholds (summarized from source, not a quotation)
GP 12.1: nominal 10 mmBtu/hr flare with up to 1,800 total hp of engines. GP 12.2: nominal 32 mmBtu/hr flare with up to 1,000 total hp (restated from Ohio EPA).
OAC 3745-31-29Official pageWell-site production GP 12.3.1 (small flare) / 12.3.2 (large flare)
General PermitFor sources commencing construction, modification, or reconstruction after December 6, 2022. Covers fugitive equipment/pipeline leaks, dehydration, spark-ignition engines, flares/combustion devices, blowdowns/rod packing, truck loading, and condensate/produced water tank batteries; incorporates NSPS OOOOb.
OAC 3745-31-29Official pageNatural gas compressor station GPs
General PermitLean-burn and rich-burn gas engines (GP 14.01-14.10, terms effective October 30, 2024); portable diesel engines (9.13, 9.14); glycol dehydrators (15.1, 15.2); flares (16.1 open, 16.2 and 16.3 enclosed); reciprocating compressors (17.1); equipment leaks (18.1); fixed-roof tanks (19.1); truck loading (20.1); pigging (21.1, effective July 9, 2024).
Thresholds (summarized from source, not a quotation)
Size bands (restated from Ohio EPA): engines 100 to 3,800 BHP; dehydrators up to 90 MMscf/day (15.1) and 90-150 MMscf/day (15.2); flares up to 1 MMBtu/hr (16.1), up to 10 (16.2), over 10 to 20 (16.3); leaks up to 10 tpy VOC; tanks up to 500 bbl; truck loading up to 32,000,000 gal/yr.
OAC 3745-31-29Official page
State air regulations
- OAC Chapter 3745-31Permits-to-install new sources and permits-to-install and operate
- OAC 3745-31-03Permit exemptions
- OAC 3745-31-29General permits
- OAC 3745-31-30Permits-by-rule
- OAC 3745-15-05De minimis air contaminant source exemption
- OAC Chapter 3745-77Title V permits
- OAC Chapter 3745-78Title V fees
- DAPC effective rulesOhio EPA DAPC rule index
Forms
Guidance
Compliance
State compliance obligations (reporting, emissions inventory, testing) are being indexed. Use the Compliance dashboard preview to see how they will be tracked.
Sources
- Ohio EPA Applying for an Air Pollution Control Permit
- Ohio EPA General Permit Program
- Ohio EPA Permit-by-Rule
- Ohio EPA Title V Permitting Program
- OAC 3745-31-21 (nonattainment)
Editorial note: Ohio EPA's PBR page cites OAC 3745-31-30 but links a file named 3745-31-03_Final.pdf; confirm against rule text. Title V fee for reporting year 2025 listed as $65.38/ton plus a $5,000 base fee. PSD/NNSR rule ranges confirmed from codes.ohio.gov rule text (3745-31-13 and 3745-31-21). Compliance Assistance Unit: 800-329-7518.
AirPermitHub provides educational, engineering, research, and compliance-support information. Information provided by the platform does not constitute legal advice and should not replace review of applicable regulations, permits, agency guidance, or consultation with qualified professionals. Full disclaimer