ND · EPA Region 8
North Dakota Air Permits
Major NSR (PSD & nonattainment)
Prevention of Significant Deterioration (PSD) Permit to Construct
PSDFor new major sources and major modifications (all of ND is attainment/unclassifiable). Requires BACT, air quality analysis, additional impacts analysis, and a 30-day public comment period.
Thresholds (summarized from source, not a quotation)
100 tons/yr for the listed source categories and 250 tons/yr for other sources, criteria pollutants only (restated from the DEQ permitting page).
NDAC 33.1-15-15; 40 CFR 52.21(b)Official page
Title V operating permits
Title V Permit to Operate
Title VMajor source operating permit, also required for some sources due to PSD applicability or Title IV Acid Rain. Initial issuance, renewals, and significant modifications need 30-day public comment, 45-day EPA review, and affected state review where applicable.
Thresholds (summarized from source, not a quotation)
At or above 100 tons/yr of a criteria pollutant, 25 tons/yr combined HAP, or 10 tons/yr of a single HAP (restated from the DEQ permitting page table).
NDAC 33.1-15-14-06Official page
Oil & Gas
North Dakota (Bakken) has a dedicated oil and gas air program. Upstream operators submit the GP-OG Application / Well Registration through CERIS-ND before well completion, then a startup notification and a Potential to Emit (PTE) report. The GP-OG is a synthetic minor permit that keeps facilities below PSD. Storage tank control is under NDAC 33.1-15-07-02.1; flares must meet NDAC 33.1-15-07-02, 33.1-15-03-03.1, 33.1-15-20, and 40 CFR 60.18. DEQ implements NSPS OOOO/OOOOa reporting. Flared gas volumes are regulated separately by the ND Industrial Commission.
Air Oil & Gas General Permit Application / Well Registration (GP-OG)
General PermitRequired for new and modified production facilities and new or recompleted wells. Startup of production notification is due within 30 days (measured from the final well), and the facility PTE Report within 90 days of startup. Sweetening units need site-specific permits.
Quoted verbatim from the agency source No later than two days prior to any planned well completion activities.
Thresholds (summarized from source, not a quotation)
Facility-wide criteria pollutant PTE below 250 tpy, excluding fugitives (restated from DEQ).
NDAC 33.1-15-14; GP-OG guidance effective July 1, 2025Official pageWell site and tank controls
OtherDEQ's Oil & Gas pages require new wells to have at least a pit flare on first production, and higher-emitting tanks need more efficient controls operating within 60 days of first production. Flares need an automatic igniter or continuous pilot.
Thresholds (summarized from source, not a quotation)
Pit flare with 90% destruction and removal efficiency; tanks emitting more than 20 tpy VOC need more efficient controls (restated from DEQ).
NDAC 33.1-15-07-02; 33.1-15-07-02.1; 33.1-15-20Official pageTitle V and PSD triggers for production facilities
OtherFacilities must notify DEQ within 60 days of exceeding Title V thresholds and apply within 12 months; PSD exceedance notification is due the first business day after the exceedance is determined.
State air regulations
- NDAC Article 33.1-15Air Pollution Control
- NDAC 33.1-15-14Designated Air Contaminant Sources, Permit to Construct, Minor Source Permit to Operate, Title V Permit to Operate
- NDAC 33.1-15-07Control of Organic Compounds Emissions (incl. storage tank and gas disposal rules)
- NDAC 33.1-15-20Control of Emissions from Oil and Gas Well Production Facilities
- NDAC 33.1-15-13Emission Standards for Hazardous Air Pollutants (cited for public comment procedures)
- NDAC 33.1-15-15Prevention of Significant Deterioration of Air Quality
- NDAC 33.1-15-23Fees
Forms
Guidance
Compliance
State compliance obligations (reporting, emissions inventory, testing) are being indexed. Use the Compliance dashboard preview to see how they will be tracked.
Sources
Editorial note: The DEQ construction page phrases the synthetic minor HAP trigger as '10 ton/yr or greater of any hazardous air pollutant'; thresholds otherwise restated from DEQ's permitting table. Chapter titles (incl. PSD at 33.1-15-15) confirmed from the NDAC Article 33.1-15 index. Indian country (e.g., Fort Berthold) is under EPA Region 8 permitting (not verified on an EPA page in this review). Permitting: 701-328-5188.
AirPermitHub provides educational, engineering, research, and compliance-support information. Information provided by the platform does not constitute legal advice and should not replace review of applicable regulations, permits, agency guidance, or consultation with qualified professionals. Full disclaimer