Skip to content
AirPermitHub

AR · EPA Region 6

Arkansas Air Permits

Arkansas DEQ issues registrations, minor source permits, general permits, and Title V permits under APC&EC Rules 18, 19, and 26. Permits must be obtained before construction begins. Minor source permits do not expire; general and Title V permits have five-year terms.
Verified against agency sourceLast reviewed 2026-10-25

Air permits & authorizations

  • Rule 18.315 Registration

    Registration / Notice

    For facilities with actual emissions in the registration band. Fixed fee per DEQ FAQ.

    Thresholds (summarized from source, not a quotation)

    Per DEQ FAQ 8 (total facility actual emissions, tpy): CO 40 to <75; NOx 25 to <40; SO2 25 to <40; VOC 25 to <40; PM 15 to <25; PM10 10 to <15; single HAP 1 to <2; combined HAPs 3 to <5.

    APC&EC Rule 18.315Official page
  • Minor Source Permit

    Minor NSR

    Required above registration levels and below Title V, and for certain listed source categories regardless of emission rate. Does not expire.

    Thresholds (summarized from source, not a quotation)

    Per DEQ FAQ 8 (tpy): CO 75 to <100; NOx, SO2, VOC 40 to <100; PM 25 or more; PM10 15 to <100; direct PM2.5 10 to <100; lead 0.5 to <10; single HAP 2 to <10; combined HAPs 5 to <25; any other air contaminant 25 or more.

    APC&EC Rule 19Official page
  • General Permits

    General Permit

    Coverage by Notice of Intent via SEEK. Minor source GPs: animal/human remains incinerators, cotton gins, gasoline bulk plants, hot mix asphalt, natural gas compression stations, rock crushing. Title V GPs: air curtain incinerators, cotton gins. Five-year term.

Major NSR (PSD & nonattainment)

  • PSD

    PSD

    Major source permitting in attainment areas under Arkansas's SIP (Rule 19). DEQ notes greenhouse gas permitting applies only to sources otherwise required to obtain a PSD permit.

    APC&EC Rule 19Official page

Title V operating permits

  • Title V Permit

    Title V

    Required at major source levels or when a federal regulation requires one. Five-year term.

    Thresholds (summarized from source, not a quotation)

    Per DEQ FAQ 8 (total facility emissions, tpy): CO, NOx, SO2, VOC, PM10, PM2.5 100 or more; lead 10 or more; single HAP 10 or more; combined HAPs 25 or more.

    APC&EC Rule 26Official page

Oil & Gas

Arkansas has a minor source General Air Permit for Natural Gas Compression Stations, obtained by Notice of Intent.

  • General Air Permit for Minor Source Natural Gas Compression Stations

    General Permit

    General permit (1868-AGP-000) for minor source compressor stations.

Oil & Gas industry hub

State air regulations

Forms

Guidance

Compliance

State compliance obligations (reporting, emissions inventory, testing) are being indexed. Use the Compliance dashboard preview to see how they will be tracked.

Sources

Editorial note: Rule PDFs linked are the versions posted on DEQ's site (2016 file dates); check for later amendments. DEQ lists a permit fee factor effective October 1, 2025 under 8 CAR § 12-402.

AirPermitHub provides educational, engineering, research, and compliance-support information. Information provided by the platform does not constitute legal advice and should not replace review of applicable regulations, permits, agency guidance, or consultation with qualified professionals. Full disclaimer